Update Terakhir : 10 Feb 2021
Rincian Produksi Listrik Menurut Ranting/Subranting diKabupaten Indragiri Hilir, 2015 |
Total of Customer of Fresh Detail of Electric Production by Branch/Subbranch |
in Indragiri Hilir Regency, 2015 |
|
|
|
|
|
|
Ranting/Subranting |
Jumlah Pembangkit (unit) |
Terpasang (kwh) |
Kapasitas Maksimum (kwh) |
Beban Puncak (kwh) |
Branch/Subbranch |
Total of Generator (unit) |
Installed (Kw) |
Maximum Capacity (Kw) |
Peak Load (Kw) |
(1) |
(2) |
(3) |
(4) |
(5) |
1 |
Tembilahan |
7 |
4 800 |
2 550 |
1 500 |
|
Mesin Pemda Inhil |
- |
- |
- |
- |
|
Sewa Tiga Bintang 1 |
4 |
- |
- |
- |
|
Sewa Tiga Bintang 2 |
4 |
- |
- |
- |
|
Sewa Bima Golden Powerindo 4 MW |
4 |
4 000 |
4 000 |
4 681 |
|
Sewa Mega Power International |
7 |
- |
- |
- |
|
Sewa Bima Golden Powerindo 7 MW |
7 |
7 000 |
7 200 |
6 949 |
|
Sewa Wahana Idea Cipta |
4 |
- |
- |
- |
2 |
Teluk Pinang + Sewa |
3 |
1 140 |
820 |
733 |
3 |
Sungai Guntung + Sewa |
6 |
3 500 |
2 200 |
2 025 |
4 |
Mandah |
3 |
300 |
170 |
140 |
5 |
Concong Luar |
4 |
700 |
390 |
325 |
6 |
Sungai Piring |
2 |
200 |
180 |
140 |
7 |
Kuala Lahang |
4 |
540 |
290 |
250 |
8 |
Perigi Raja |
1 |
100 |
95 |
93 |
9 |
Simpang Gaung (Sewa) |
2 |
1 100 |
600 |
530 |
10 |
Bekawan |
2 |
200 |
170 |
134 |
11 |
Igal |
1 |
100 |
85 |
52 |
12 |
Sapat |
2 |
200 |
190 |
190 |
13 |
Seberang Tembilahan |
2 |
700 |
330 |
237 |
14 |
Pulau Burung (Sewa) |
2 |
960 |
500 |
490 |
15 |
Belanta Raya |
2 |
500 |
370 |
300 |
16 |
Bagan Jaya |
- |
- |
- |
- |
17 |
Rotan Semelur |
3 |
725 |
390 |
228 |
18 |
Tanjung Lajau |
1 |
100 |
90 |
82 |
Jumlah/Total |
70 |
29 164 |
18 490 |
17 364 |
Sumber: PT PLN (Persero) Ranting Tembilahan/ PLN |
|